Boze Titanium Manufacturing Center | Standard Parts / Pipe Fittings | AS9100D

Titanium Pipe Fittings โ€” ASME B16.9 / ASTM B363 Buttweld

Butt-weld titanium pipe fittings in CP Gr.1 / Gr.2 / Gr.5 (Ti-6Al-4V) / Gr.7 (Ti-Pd) / Gr.12 (Ti-0.3Mo-0.8Ni). NPS 1/2 to 24 inch, SCH 5S to SCH 160. Elbows 90 LR / 90 SR / 45, tees equal / reducing, reducers concentric / eccentric, caps, stub ends, crosses, laterals. Forged to ASTM B363 and ASME B16.9 with MSS SP-43 stub ends. Standard stock 5-7 days, custom 2-3 weeks.

Read more
NPS 1/2-24" Size range
SCH 5S-160 Wall schedule
Elbows / Tees / Reducers Fitting form
5-7 days Standard lead time
ASME B16.9 ASTM B363 ASME SB363 MSS SP-43 EN 10204 3.1 AS9100D

Honest Positioning

Where We Do Not Compete

BOZE Metal is a sourcing and processing partner for titanium pipe fittings, not a primary melter. The following scope clarifications are necessary for accurate technical and commercial alignment on pipe-fitting orders for chemical, chlor-alkali, and desalination service.

No primary melting

Sponge, VAR, and EBM melting and billet production is not in our vertically integrated scope. We source seamless tube, plate, and forging billet from upstream mills; our scope is hot-push / hydraulic bulge / press forming, heat treatment, bevel machining, NDT, and quality verification.

No blanket aerospace-grade

Material specifications are applied "where applicable" per order. AS9100D governs our QMS, not every shipment classification. Confirm criticality class, specification (ASTM B363 / ASME SB363 / ASME B16.9 / MSS SP-43), and required documentation per RFQ.

No blanket medical claim

We supply fittings to medical material specifications (ASTM F67, F136) where applicable. We are a material supplier and processor, not a finished medical device manufacturer; downstream device-level certification remains the device maker responsibility.

No 24-hour quote promise

Engineering review and quotation timelines are confirmed at the RFQ stage based on the order complexity, alloy, NPS, schedule, and downstream processing required. Standard stocked items typically receive a same-week response.

NACE / NORSOK scope

Sour-service and subsea service compliance is order-specified. NACE MR0175 / ISO 15156 hardness compliance, NORSOK M-630, and individual project qualification reports are available with a documented test scope. Confirm at the RFQ stage; the scope is not assumed by default.

Grade Library

Fitting Grade x Form Matrix

Five procurement-grade entries mapping chemical composition, UNS designation, available fitting form (elbows, tees, reducers, caps, stub ends), and typical use. Specific NPS, schedule, and fitting type are confirmed per order.

Family Grade / UNS Composition Fitting Form Typical Use
CP Titanium Grade 1UNS R50250 Unalloyed Ti, lowest interstitial Elbows, tees, reducers, caps, stub ends High-formability fittings for chemical and biomedical service, deepest drawing and cold-forming operations
CP Titanium Grade 2UNS R50400 Unalloyed Ti, balanced strength Elbows, tees, reducers, caps, stub ends Workhorse CP fittings for chemical, chlor-alkali, and seawater piping
Aerospace a-b Grade 5 (Ti-6Al-4V)UNS R56400 6% Al, 4% V, a-b alloy Elbows, tees, reducers, caps, stub ends High-pressure and high-temperature service, aerospace and subsea headers
Corrosion-resistant Grade 7 (Ti-Pd)UNS R52400 CP + 0.12-0.25% Pd Elbows, tees, reducers, caps, stub ends Reducing-acid (HCl, dilute H2SO4) and chlor-alkali membrane electrolyzer piping
Corrosion-resistant Grade 12 (Ti-0.3Mo-0.8Ni)UNS R53400 CP + 0.3% Mo, 0.8% Ni Elbows, tees, reducers, caps, stub ends Hot brine, seawater, and MSF / MED desalination piping

Specification Reference

Pipe Fitting Specification EAV Reference

Eleven procurement-critical attribute, value, and standard references for titanium butt-weld pipe fittings. Use this as a cross-check table when drafting an RFQ; the applicable spec is selected per order.

Attribute Value / Range Standard
Size range (NPS) NPS 1/2 to NPS 24 (larger on request) ASME B16.9
Wall thickness (schedule) SCH 5S, 10S, 40S, 80S, 160, XXS; custom heavy wall available ASME B36.19M
Fitting types Elbows 90 LR / 90 SR / 45 / 180 return; tees equal / reducing; reducers concentric / eccentric; caps; stub ends; crosses; laterals ASME B16.9
Stub end type Type A (lap-joint), Type B (lap-joint with backing), Type C (butt-weld) MSS SP-43
Bending radius (elbow) LR = 1.5 x D (long radius), SR = 1.0 x D (short radius) ASME B16.9
Forging standard ASTM B363 (wrought) / ASME SB363 ASTM B363
Dimensional standard ASME B16.9 (butt-weld), MSS SP-43 (stub ends) ASME B16.9
Tensile strength (wrought) Gr.2 >= 345 MPa, Gr.5 >= 895 MPa, Gr.7 >= 345 MPa, Gr.12 >= 483 MPa ASTM E8
Wall thinning limit (elbow) Plus or minus 10 percent of nominal wall thickness at the intrados (per ASME B16.9) ASME B16.9
NDT 100 percent RT per ASTM E1742; PT on weld prep; hydrostatic test; PMI verification ASTM E1742, ASME Sec. V
Mill certification EN 10204 3.1 standard; 3.2 with independent witness on request EN 10204
Titanium Grade 2 butt-weld 90 degree long-radius elbow and concentric reducer
Petrochemical and Chlor-Alkali, ASTM B363

Elbows and Reducers for High-Pressure Chemical Piping

Grade 2 (CP) and Grade 7 (Ti-Pd) butt-weld elbows (90 LR / 90 SR / 45) and concentric / eccentric reducers are the workhorse specification for chemical, chlor-alkali, and desalination piping. Hot-push and hydraulic-bulge forming is followed by vacuum anneal and CNC bevel machining. Wall-thinning at the intrados is held to within ASME B16.9 plus or minus 10 percent of nominal.

  • Hot-push and hydraulic-bulge forming
  • Wall-thinning within ASME B16.9 plus or minus 10 percent
  • CNC 37.5-deg bevel per ASME B16.9
View elbows and reducers specs
Titanium equal tee, reducing tee, and lap-joint stub end for chemical and seawater piping
Fine Chemical and Seawater, MSS SP-43

Tees and Stub Ends for Branch Connection and Lap-Joint Assembly

Grade 2 equal and reducing tees are the standard specification for branch connection in seawater and brine headers. Lap-joint stub ends (Type A / B / C per MSS SP-43) are supplied in CP Gr.2 for titanium-to-stainless transitions and titanium-to-carbon-steel (insulated) transitions. All tees and stub ends are 100 percent RT-tested and vacuum-annealed.

  • Equal and reducing tees, ASME B16.9
  • Stub ends Type A / B / C, MSS SP-43
  • 100 percent RT and hydrostatic test
View tees and stub ends specs

Additional Applications

Fittings Across Process Industries

Four additional service environments where titanium butt-weld pipe fittings are the default specification, with the grade and fitting type that procurement teams typically call out.

Fine Chemical

Reactor feed and product piping for HCl, H2SO4, chlorinated organics. Gr.7 (Ti-Pd) for reducing acid. ASME B16.9 dimensions.

Chlor-Alkali

Wet chlorine, NaClO, and NaOH cell and header piping. Gr.7 (Ti-Pd) is the default. Class 150 / 300 standard.

Desalination

RO high-pressure piping and MSF / MED brine heater headers. Gr.2 for RO permeate and intake; Gr.12 for hot brine.

Subsea and Pharmaceutical

Subsea jumpers and manifolds per NORSOK M-630. Pharmaceutical clean utility per ASME BPE (where applicable). Gr.5 ELI for fracture-critical subsea.

Production Workflow

Fitting Production Workflow

From drawing review and stress simulation through hot-push / hydraulic-bulge forming, vacuum anneal, CNC bevel machining, NDT, and EN 10204 3.1 MTR issuance - six controlled stages with documentation checkpoints at each handoff.

  1. 01

    Drawing review and stress simulation

    Engineering reviews the customer isometric and stress analysis, validates the bend radius and wall-thickness compensation factor, and confirms the forming process (hot-push vs hydraulic bulge vs press) for the specified NPS and schedule before raw material is released.

  2. 02

    Raw material cutting and billet prep

    For seamless elbows and tees, hot-push billet or seamless tube is cut to length and induction heated. For welded fittings, plate is cut to pattern, edge-prepped, and rolled to required geometry. All material is verified against ASTM B363 chemistry before forming.

  3. 03

    Hot-push, hydraulic bulge, or press forming

    Elbows are hot-pushed on a medium-frequency induction mandrel pusher; tees and reducers are formed by hydraulic bulge on a split die; stub ends are cold-formed from plate and machined. Wall-thinning at the intrados is held to within ASME B16.9 plus or minus 10 percent of nominal wall.

  4. 04

    Vacuum anneal and stress relief

    All formed fittings are vacuum-annealed to relieve cold-work and forming residual stress. The cycle is tuned per grade to restore ductility without grain coarsening. Dimensional stability is verified by pre- and post-anneal CMM measurements.

  5. 05

    CNC bevel machining and dimensional control

    High-rigidity CNC lathes cut the butt-weld bevel per ASME B16.9 (default 37.5 degrees, with 30-deg and 0-deg options on request). Out-of-roundness is held to within 1 percent of nominal OD; wall-thickness is CMM-checked at 8 circumferential locations.

  6. 06

    NDT, hydrostatic test, PMI, and packaging

    100 percent radiographic test (RT) per ASTM E1742, surface PT on bevel and weld-prep, hydrostatic test to 1.5 x design pressure, and positive-material-identification (PMI) by XRF. EN 10204 3.1 MTR is issued with chemistry, mechanical, and NDT records traceable to the originating heat.

Operating Boundaries

Operating Boundaries and Failure Modes

Three service-environment boundaries that drive alloy selection, fitting form, and installation practice. Confirm these constraints at the RFQ stage.

High-temperature service ceiling

CP titanium (Gr.2) loses tensile strength progressively above 300 C. Gr.5 (Ti-6Al-4V) is the default for sustained service above 300 C up to about 315 C. For service above 315 C, Gr.5 ELI or higher-temperature alloys are recommended; confirm at the RFQ stage.

Medium exclusion: dry chlorine and HF

Titanium must not be used in dry chlorine, anhydrous hydrogen fluoride, or high-concentration boiling phosphoric acid media. These cause rapid attack, hydrogen embrittlement, or violent corrosion. Use nickel-based or specific alloy alternatives for these services.

Welding protection requirement

Field installation welding must use high-purity argon (>= 99.999 percent) trailing-shield and back-side purge. Any blue, gray, white, or powdery weld color indicates oxygen / nitrogen contamination; the affected zone must be removed and re-welded before commissioning.

AS9100D

Aerospace Quality Management System

ISO 9001:2015

Certified Quality Management System

ISO 13485

Medical Device QMS โ€” Authorized Contract Manufacturing

MTR Traceability

Material Test Reports with Every Shipment

Quality

Uncompromising Quality Control

Every titanium part is verified, documented, and traceable before it leaves our Baoji facility โ€” because in aerospace and medical manufacturing, documentation is just as critical as the cut itself.

CMM Inspection

Coordinate Measuring Machines verify every critical dimension against GD&T to ยฑ0.005 mm before any part ships.

FAIR Reports

Project-specific First Article Inspection Reports delivered for every new part number โ€” engineered for fast PPAP / FAIR approval.

Material Traceability

Material Test Reports (mill certificates) accompany every shipment for full source-to-component traceability.

Procurement and Lead Time

Supply Chain and Lead-Time Windows

Stock availability, MOQ flexibility, and lead-time windows for titanium pipe fittings. Final lead time is confirmed at the RFQ stage against the current upstream-mill material and forming schedule.

Capacity and MOQ

Forming capacity from NPS 1/2 to NPS 24 in SCH 5S through SCH 160. Engineering prototype sample supported down to 1 piece for custom geometries; production runs of several hundred pieces per heat are standard. Special alloy pulls and exotic dimensions are scheduled against the upstream-mill material campaign.

Stock and lead time

Standard stocked Gr.2 elbows, tees, reducers, caps in NPS 1/2 to 12 ship in 5-7 days. Non-standard schedule, exotic alloy, and large-diameter fittings run 2-3 weeks. Final lead time is confirmed at the RFQ stage.

Documentation and third-party witness

EN 10204 3.1 mill test report (chemistry, mechanical, NDT) is standard. 3.2 with independent witness from Lloyds, Bureau Veritas, DNV, or customer-appointed agencies is supported and arranged at the RFQ stage. PMI verification and hydrostatic test report are attached to each shipment.

Dimensional Comparison

Titanium Fittings vs. Stainless Steel and Lined Carbon Steel

Four procurement-relevant dimensions comparing titanium butt-weld pipe fittings (Gr.2 reference) against the conventional austenitic stainless and lined carbon-steel alternatives in chemical, chlor-alkali, and seawater service.

Dimension Titanium Fitting (Gr.2 / Gr.7) Austenitic SS Fitting (304L / 316L) Lined Carbon Steel Fitting (Rubber / PTFE)
Chloride corrosion resistance Immune to pitting, crevice, and chloride stress corrosion in seawater and brine Susceptible to pitting above about 1000 ppm chloride; risk of chloride SCC Liner integrity critical; debond or perforation risk on damage
Operating temperature ceiling About 315 C in Gr.5 ELI; about 300 C in Gr.2 About 400 C in 316L; risk of chloride SCC at 60-200 C Limited by rubber or PTFE liner (about 100-200 C)
Service life (chlor-alkali or seawater) Decades; decades-long service with no replacement 3-8 years; periodic local repair or replacement 2-5 years; local delamination and perforation
LCC (life-cycle cost) Higher initial investment, decades of service with no maintenance Lower initial cost, periodic replacement adds up Moderate initial cost, frequent repair; liner risk

Applications

Titanium Parts That Perform Where It Matters

From aircraft structures to surgical implants, precision titanium machining delivers the strength, bio-compatibility, and corrosion resistance that demanding industries rely on.

[Aerospace Structural Element] AERO

Aerospace Structural Elements

Brackets, fittings & frames machined from Grade 5 Ti-6Al-4V under AS9100D-controlled processes.

[Orthopedic Bone Screw] MED

Orthopedic Bone Screws

Implant-grade Grade 23 ELI (Ti-6Al-4V ELI) parts machined in cleanroom-controlled environments.

[Marine Valve Components] MAR

Marine Valve Components

Corrosion-resistant titanium valves, shafts & housings engineered for extreme offshore service.

[Motorsport Fasteners] MTR

Motorsport Fasteners

High-strength titanium bolts, studs & hardware for racing and high-performance vehicles.

Engineering and Procurement FAQ

Frequently Asked Questions

Six common buyer questions on hot-push wall-thinning, Gr.2 vs Gr.7 selection, galvanic isolation, springback control, HAZ brittleness, and custom non-standard lead time.

Q1How do you prevent inner wrinkling and outer wall thinning during hot-push of titanium elbows?
By combining local medium-frequency induction heating with a mandrel limit pusher, the heating temperature gradient and the feed rate are tightly controlled so that the metal deforms uniformly in the circumferential direction. The mandrel limits the inner radius while the punch pushes the tube forward, holding wall-thinning to within ASME B16.9 plus or minus 10 percent of nominal wall thickness at the intrados.
Q2In chlor-alkali service, should I select Gr.2 (CP) or Gr.7 (Ti-Pd) titanium fittings?
If the medium contains trace reducing acid or the geometry is in a crevice-corrosion high-risk zone (e.g. wet chlorine and hot brine headers), Gr.7 (Ti-Pd) is the default specification. The 0.12-0.25 percent Pd addition stabilizes the passive film in reducing environments and prevents under-deposit and gasket-face attack. CP Gr.2 remains the workhorse for oxidizing chloride media where crevice geometry is controlled.
Q3Can titanium pipe fittings be in direct contact with stainless or carbon steel supports?
No. Direct metal-to-metal contact is strictly forbidden. Non-metallic insulating pads (PTFE, EPDM, or PVDF) must be placed between the titanium fitting and any carbon-steel or stainless-steel support. Direct contact causes galvanic corrosion of the ferrous member and surface carburization of the titanium, both of which lead to early failure.
Q4How is springback in cold-formed titanium fittings controlled?
Multi-axis CNC press forming with closed-loop force feedback is used for cold-formed stub ends and concentric reducers. The press stroke is compensated in real time for springback using a strain-hardening model per grade; vacuum stress relief after forming removes residual stress to within plus or minus 0.5 percent dimensional drift.
Q5How is HAZ brittleness prevented during titanium fitting welding?
Welding is performed under high-purity argon (>= 99.999 percent) trailing shield with simultaneous back-side purge. Interpass temperature is held below 150 C to limit oxygen, nitrogen, and hydrogen pickup. Post-weld vacuum stress relief is applied for thin-wall and high-pressure service; the resulting weld HAZ matches base-metal corrosion performance in standard ASTM B363 qualification testing.
Q6What is the lead time for custom non-standard titanium fittings?
Custom non-standard fittings (special schedule, exotic alloy, custom geometry) are scheduled against the upstream-mill material campaign and the in-house forming lead time. Standard custom lead time is 2-3 weeks; large-diameter (NPS 20 and above) or multi-piece welded assemblies can run 4-6 weeks. Final lead time is confirmed at the RFQ stage.
About Boze Titanium Manufacturing Center

One Metal. One Focus. Infinite Precision.

Founded in 2011 in Baoji's Titanium Valley, BOZE Metal is dedicated exclusively to titanium โ€” from raw material to precision engineering. AS9100D, & ISO 9001 certified with 500+ clients across Aerospace, Medical & Motorsport industries, we deliver end-to-end precision titanium CNC machining with full material traceability from source to component.

Boze Titanium Manufacturing Center is operated by Baoji Boze Metal Products Co., Ltd.

Certifications verified by ASTM International titanium material specifications (B265, B348, B381, F136, F2924) with full EN 10204 3.1 mill test certification. Our quality system is operated under AS9100D by Baoji Boze Metal Products Co., Ltd.

AS9100D ISO 9001 500+ Clients 15+ Years OEM/ODM